Carrying forward the advantages of using an aluminium helideck, an aluminium support frame becomes a logical next step.
We design and build these frames and support structures and then pre-fabricate and trial fit them at our factory. They are then packed in containers and shipped to you in knocked down form. Re-assembly requires fasteners only and is an extremely quick process. A typical support frame for a 22m deck will require 1 week for assembly.
Aluminium alloy support frames offer great advantages:
- 60% weight savings over steel equivalent
- Completely maintenance free
- 1 week assembly (against several months for steel)
- No welding, painting or blasting required
- Light weight reduces lift requirements
- Cost effective against steel
- Re-usable and recyclable
6m high aluminium helideck support frame under construction Apr 2008
6m high aluminium support frame for helideck for Shell MKDP unmanned platform
Alu support frame designed for an S92 helideck
Alu support frame showing walkway
6m high aluminium support structure on Emas175 workboat (Mar 2008)
22m helideck plus 3m support frame in single lift, total weight of 39MT
Lifting helideck with aluminium support frame
Aluminium support frame under assembly
Aluminium helideck support frame for a Norwegian vessel